Office Move Checklist: How to Plan a Business Relocation

Short answer

Plan an office move at least eight to twelve weeks ahead. Appoint one coordinator, arrange a survey, clear out what you no longer need, book lifts and parking at both buildings, and label every crate by room and desk. Schedule the move over a weekend or in phases to keep trading. A small office move for 10 to 20 staff typically costs £1,200–£3,500.

Office Move Checklist: How to Plan a Business Relocation

Start early and appoint a coordinator

Office moves go wrong when nobody owns them. Appoint one person to coordinate the move, make decisions and be the main contact for the removal crew, landlords, IT support and staff. For larger moves, a small team with representatives from each department helps, but one person should have the final say.

Start planning eight to twelve weeks before the move date, longer for big offices. That gives time to arrange surveys, compare quotes, sort out IT and telecoms, give notice on services, and clear out unwanted furniture and files. Rushed moves cost more and cause more disruption.

Timeline checklist

The table sets out a typical timeline for a small to medium office move. Adjust it for the size of your business and the complexity of the move, for example if you have workshops, labs or server rooms.

WhenTasks
8–12 weeks beforeAppoint coordinator, arrange survey, get quotes, plan new layout
6–8 weeks beforeBook removal crew, notify IT and telecoms, start clear-out
4 weeks beforeBook lifts and parking, order crates, confirm disposal
2 weeks beforeLabel plan issued, staff pack non-essential items
Move weekFinal packing, IT shutdown, move, set-up
After the moveSnagging, return crates, hand back old premises

Survey, layout and labelling

A site survey, in person or by video, lets the removal company list everything being moved, measure access at both buildings and plan crew size, vehicles and timings. Share the floor plan of the new office with desk and room numbers marked. This becomes the basis for the labelling system.

Every crate, piece of furniture and item of equipment should carry a label showing its destination room and desk number. Colour-coded labels by floor or department make unloading faster. When the crew arrives at the new building, they place each item in the right spot, so staff can start working straight away rather than hunting for boxes.

  • Number every room and desk on the new floor plan
  • Label each crate and item with its destination
  • Use colour codes by floor or department
  • Keep a master inventory of crates per team
  • Mark crates containing essential items to unpack first

IT, telecoms and essential equipment

IT is the part of an office move most likely to cause downtime. Involve your IT provider early to plan network cabling, internet connections and phone systems at the new premises. New lines and broadband can take weeks to install, so order them well in advance and test before moving day.

On the day, IT equipment should be shut down properly, cables bagged and labelled, and screens, computers and printers packed in padded crates. Servers and network equipment need particular care and may be moved by your IT provider directly. Back up all data before the move. Reconnecting and testing everything at the new office should be scheduled before staff return.

Clearing out and disposal

A move is the best time to clear out old furniture, broken equipment and paper files you no longer need. Moving items you will throw away later costs money. Go through each area well before the move and decide what is staying, going to the new office, being sold, donated, recycled or disposed of.

Unwanted furniture and equipment must be disposed of properly. Anyone carrying business waste must be registered as a waste carrier, so check the removal company or clearance contractor has that registration. Old electrical equipment falls under the WEEE Regulations and should go to an appropriate recycling route. Confidential paper should be shredded securely, with a certificate of destruction for your records.

Keeping staff informed

Staff cooperation makes or breaks an office move. Tell everyone the move date, what they need to pack themselves, when crates will arrive and the deadline for packing. Issue a short guide covering how to label crates, what not to pack, such as personal valuables and confidential documents left loose, and when to shut down their computers on the last day.

Share the new floor plan so people know where they will sit, along with practical details about the new building: access arrangements, parking, kitchen facilities and nearby transport. On the first morning, have someone available to deal with snags such as missing crates, desks in the wrong place or equipment that will not connect. A smooth first day sets the tone for settling in.

  • Announce the move date and packing deadline early
  • Issue a simple packing and labelling guide
  • Share the new floor plan and building information
  • Have a snagging contact on the first morning

Moving day and costs

Most office moves happen over a weekend or in the evening so the business keeps trading. Larger offices may move in phases, one department at a time. Book goods lifts and loading bays at both buildings, arrange parking for the vehicles and protect floors, walls and door frames. Make sure someone with keys and authority is available at both sites throughout.

A small office move for 10 to 20 staff typically costs £1,200–£3,500, including the crew, vehicles, crates and furniture dismantling. Distance, floors and lift access, weekend working, the amount of IT equipment and specialist items such as safes and workshop machinery all affect the price. A survey gives a fixed figure.

Questions people also ask

How long does an office move take?

A small office can often be moved in a single day or over a weekend. Larger offices may take several days or be moved in phases. Planning typically starts eight to twelve weeks before the move date.

Do removal companies provide crates for office moves?

Yes, most provide plastic crates delivered before the move and collected afterwards. Crates are stronger and stack better than cardboard boxes, and they speed up packing and unpacking.

Can the removal company take away old office furniture?

Often, yes. Check they are registered as a waste carrier, and ask how items will be reused, recycled or disposed of. Electrical equipment should be handled in line with the WEEE Regulations.